






🎮 Elevate your entertainment—connect like a pro with True HQ’s ultra-reliable HDMI cable!
The True HQ 15M HDMI Cable is a premium, UK-designed high-speed cable featuring 24K gold-plated connectors, double shielding, and copper wiring to deliver flawless Full HD 1080p video and immersive 3D audio. With Ethernet, ARC, and broad device compatibility, it’s engineered for seamless, long-distance connectivity across gaming consoles, TVs, PCs, and more, backed by a 3-year warranty for guaranteed quality.





J**W
Does the job
Was a bit worried about getting a long cable as might lose quality or lag, but really good and works well
D**F
Good quality, great length. Like me
Can't fault this for the money. Needed a long length to run a projector to a laptop and this fitted the bill. One thing to note and this is nothing to do with the product, if you're using an adapter as I was with a Surface (mini DP to HDMI) it doesn't work. It's fine for a monitor up to about a metre away but at this length the signal needs power. Once I'd sorted that conundrum out and swapped to a laptop with a dedicated HDMI port all was good. Recommended.
Y**A
Good but heavy
I carry HDMI cables around with me as I travel to delivering training courses from my laptop. It's sensible to have a lengthy cable like this one but I wish it wasn't so thick and heavy. In other circumstances that wouldn't be a problem and might indicate quality. Good value.
J**N
No latency at all
This 10 metre HDMI cable works perfectly. The picture and sound quality are crystal clear even over the long distance. No lag or signal loss. Great choice if you need a longer cable that still performs well!
R**J
LEAD
JUST THE JOB
E**S
Doesn’t work for long
Purchased and received at the end of January it is now the middle of April and it no longer works
A**Y
Excellent
Works like a charm no complaints from me
K**F
Nice long
Good quality
Trustpilot
2 months ago
3 weeks ago